Our Work
Recent projects across the Hunter.
Real before-and-after case studies from homes and businesses we've worked on. Tap any photo to see how it looked before we started.


Weatherboard exterior repaint
Full weatherboard prep — sanding, filling and priming — followed by a fresh charcoal and crisp white finish that lifts the whole street frontage.
Job duration: 5 days


Rendered brick facade refresh
Chalky patchy render brought back to life with a warm neutral scheme and crisp white eaves that highlight the home's clean lines.
Job duration: 4 days


Living room feature wall
Two-coat feature wall in deep charcoal with fresh whites throughout the open-plan living space — completed while the family stayed in the home.
Job duration: 2 days


Kitchen cabinetry respray
Tired oak cabinets stripped, primed and sprayed in a rich navy — walls and ceiling repainted in warm white for a full kitchen transformation.
Job duration: 6 days


Nursery repaint before baby
Low-VOC premium paints in soft dusty blue and pure white — safe finish, quick turnaround so the room was ready well before the due date.
Job duration: 2 days


Precision window trim restoration
Flaking timber window frames scraped, filled and re-coated with premium enamel — detailed cut-in against a fresh sage-green wall.
Job duration: 3 days


Shopfront overnight repaint
After-hours navy and white shopfront refresh so the business didn't lose a day of trade — signage masked, kerb reopened by 7am.
Job duration: 2 nights


Warehouse walls & line marking
Full internal warehouse repaint in bright industrial white, plus fresh safety-yellow floor line marking on the polished concrete slab.
Job duration: 1 week


Driveway pressure clean
Years of oil, tyre marks and mould lifted from a suburban concrete driveway in a single visit — no chemicals left behind.
Job duration: Half day


Brick paver footpath restoration
Original terracotta paver colour brought back to life — moss and grime removed from every joint with high-pressure hot water cleaning.
Job duration: 1 day


Face brick mould removal
Heavy black mould softwashed and pressure rinsed from the shaded southern brick wall — safe treatment that won't strip the mortar.
Job duration: Half day


Picket fence & gate repaint
Weathered timber pickets sanded back, primed and finished in two coats of premium exterior white — new hinge hardware installed.
Job duration: 3 days


Tile roof restoration & repaint
High-pressure clean, re-bedding of ridge capping, sealer and two coats of heat-reflective charcoal membrane over faded terracotta tiles.
Job duration: 4 days
Want a finish like this on your property?
Get your free quote